Name of the project : Fabrication and installation of above and underground process piping work for Siam Michelin Plant in Hat Yai

Location :  Hatyai, Songkla, Thailand

Client : Technip Engineering (Thailand) Ltd.

Work description :
Fabrication and installation of 102,000 DB of AG piping and 6,000 DB of underground piping with 70 tons of pipe support and 5,000 sq. m of blasting and painting work. The pipe materials consisted of carbon steel (A106 Gr. B), stainless steel (SUS 304, 316 and BPE), U-PVC, and C-PVC (all for schedule 80).

Contract value (Baht) : Baht 155,000,000.-

Construction period : January 2012- August 2013

Scope of Work :
Engineering design and piping materials were provided by client. Pipe support and painting materials were supplied by K Thai. K Thai was responsible for pre-fabrication, site erection, wrapping for UG piping, sandblast and painting, hydrostatic test, and NDT.

Fabrication and installation of fire water and process piping

Fabrication and installation of Bio-process engineering (BPE) piping