Name of the project : Construction of HMC-PDH interconnection pipeline
Location : Mabtaphut Industrial Estate Rayong Thailand
Client : TRC Public Company Limited
Work description :
Fabrication and installation of aboveground pipeline on piperack from HMC polymer plant to PDH plant in Mabtaphut Industrial Estate. The pipelines were of 6”, 4”, and 2” with 17,500 m total pipe length. Welding work were 30% RT.
Contract value (Baht) : 27,540,273.10
Duration : May, 2008- February, 2009
Scope of work :
– Fabrication and installation of pipeline, guide, and supports.
– Hydrostatic test, cleaning, and pigging
– Radiographic test