Name of project : Piping and mechanical installation work of infrastructure and utility system improvement for Plasma Fractionation Center
Client : The Thai Red Cross Society
Location : Bangphra, Cholburi province, Thailand
Contract value (Baht) : 48,600,000.-
Duration : 15 June 2020 – 25 January 2021
Type of contract : P and C
Scope of work :
– Dismantle existing equipment and piping for brine system
– Construction of cooling tower, chiller and pump foundations
– Installation of 1 chiller, 2 Cooling Towers and 11 pumps.
– Fabrication and erection of 2,000 DB of carbon steel pipe and 9,000 DB of stainless steel pipe.
– NDT work
– Pre-commissioning (hydrostatic test, flushing)
– Painting work
– Insulation work (PIR cold insulation)