Name of the project : Construction of deep thickener tank and structures, Alcan G3-Gove Expansion Project
Location : Mahidol Aduldej dry dock Sattahip Naval base, Chonburi
Owner : Alcan Gove Development Pty Limited
Client : STP & I Public Company Limited
Type & capacity : 4 tanks at 18.5 Ø m x 24 m and steel structures (Total wt. 2,050 tons)
Contract Value (Baht) : 69,341,334.(All permanent materials were provided by owner)
Duration : March 3rd , 2005 – September 30th , 2005
Scope of Work : Fabricated parts from K Thai’s workshop which were assembled at Dockyard before shipping as modules to Australia are of the following:
– 1,000 tons of 4 tanks (18.5 Ø m x 24 m ) with conical bottom at 38 mm maximum thickness
– 600 tons of built up column and support for tanks, at maximum size of H1200 x 450 x 36 mm
– 100 tons of 4 tank decanters
– 350 tons of steel structures
All permanent materials were provided by owner.
Construction of deep thickener tanks, piping, and structures
Construction of deep thickener tanks and structures finished with insulation and exported to Australia