Name of the project : Road and infrastructure phase II project
Location : Asia and Hemraj Industial Estate Mabtaput, Rayong, Thailand
Client : PTT Public Company Limited
Work description :
To complete the infrastructure of PTT’s new industrial estate named “Wanarom”. Work consisted of site preparation, piling, construction of road and drainage, water potable pipeline (3,000 m of 6” galvanized steel pipes), underground raw water pipeline (4,000 m of 22” HDPE pipes), and waste water system (concrete sump and 2,500 m of 8” HDPE pipeline). Fabrication and installation of 200 tons of piperack to facilitate the piping work between the plants in the future.
Contract value (Baht) : 96,000,000.
Duration : January 2013- January 2014
Scope of Work :
Detailed engineering design and supply of all construction materials , fabrication and erection of pipe rack, fabrication and erection of pipelines, construction of roads, drainages, and waste water sump.
Fabrication and installation of pipe rack for PTT’s Wanarom Industrial Estate
Construction of road and drainage
Inspection of welding seam by PT method
Inspection of dry film painting thickness by digital coating thickness gauge