Name of project : Tank farm fabrication & installation service for Methyl Ester Plant II Project
Client : Global Green Chemical PLC.
Location : Nhongyai, Cholburi
Contract value (Baht) : 133,859,020
Duration : 1 January 2017 – 30 April 2018
Type of contract : EPC
Scope of work :
29 tanks (600 T Carbon steel tank, and 200 T SS304 / SS316) with 1 Fiberglass for HCL storage tank
– Design as per API 650
– Fabrication / installation / painting
– Insulating (Total 11 tanks to be insulated; total area 6,300 m2)
– Complete with walk way / stair / tank accessories
Tankage work